Log Week 2 [10/12/2013]:
The future looks promising and hopefully, the current team can keep the ball rolling till the end.
As always, the meeting showed constant progress in all the members.
P.S: First assembly to be held in an assigned lab environment.
Discussion:
- Looked at physical design and weight requirements.
- Talked about different instrumentation and sharing thereof for different payloads.
- Collaborated on filling-in team members where necessary.
- As it stands, we will still be meeting or beating the Gantt chart deadlines.
- Capstone class structure for spring '14.
- Types of balloons that will be launched.
Things To Expect From Next Meeting:
- Re-visit doodle pool and revise your schedule as necessary (link).
- Refine and further evaluate the initial design in-depth.
- Get familiarize yourself with specific instruments through research.
Written By:
Abdul K. Siddiqui (USIP-UH member)
No comments:
Post a Comment