Saturday, October 12, 2013

Second USIP Meeting

Log Week 2 [10/12/2013]:
The future looks promising and hopefully, the current team can keep the ball rolling till the end. 
As always, the meeting showed constant progress in all the members.

P.S: First assembly to be held in an assigned lab environment.

Discussion:
- Looked at physical design and weight requirements.
- Talked about different instrumentation and sharing thereof for different payloads.
- Collaborated on filling-in team members where necessary.
- As it stands, we will still be meeting or beating the Gantt chart deadlines.
- Capstone class structure for spring '14.
- Types of balloons that will be launched.

Things To Expect From Next Meeting:
- Re-visit doodle pool and revise your schedule as necessary (link).
- Refine and further evaluate the initial design in-depth.
- Get familiarize yourself with specific instruments through research.

Written By:
Abdul K. Siddiqui (USIP-UH member)

No comments:

Post a Comment